Cron expression for weekdays at 9 AM

Runs the job Monday through Friday at 9:00 AM and skips the weekend.

0 9 * * 1-5

Generator

At 09:00 AM, Monday through Friday

Field by field

  • Minute · 0–59 0 only at minute 0
  • Hour · 0–23 9 only at 09:00
  • Day of month · 1–31 * every day of the month
  • Month · 1–12 or JAN–DEC * every month
  • Day of week · 0–7 or SUN–SAT 1-5 Monday through Friday

Next runs in your local time

Why this schedule, and when it bites

0 9 * * 1-5 is the canonical office-hours schedule: one run each weekday morning and silence on Saturday and Sunday. It looks trivial until the day-of-week field gets involved. Cron numbers days from Sunday: 0 and 7 both mean Sunday, 1 is Monday and 5 is Friday. Writing 0 9 * * 0-4, a common slip from zero-based habits, fires Sunday through Thursday and misses every Friday.

Sunday is 0, and also 7. Both values name Sunday. The range 1-5 is the safe way to say Monday through Friday. If a job mysteriously fails to run on Fridays, read the day field first.

The hour is the server's hour. 0 9 means 09:00 in the timezone the cron daemon follows, often UTC on a VPS while the team sits three hours ahead. Nine o'clock local becomes 6 AM UTC. Set the host timezone deliberately before trusting any morning schedule.

A missed 9 AM is missed for the day. Plain cron does not catch up. If the machine is asleep or the daemon is down at 09:00, the run simply never happens. For reminders and reports that must survive a restart, add a catch-up check on boot or use a scheduler with a persistent timer.

Where this cron expression shows up

  • Standup reminders
  • Sync jobs that only need to run on workdays
  • Reports that mean nothing on a Saturday

Common variations

  • Weekdays every 15 minutes, 9 AM to 5 PM

    */15 9-17 * * 1-5 Every 15 minutes, between 09:00 AM and 05:59 PM, Monday through Friday

  • Mondays only, at 9 AM

    0 9 * * 1 At 09:00 AM, only on Monday

Ranges, steps, and names are spelled out on the cheat sheet.

Questions this schedule raises

Do weekends count as days 6 and 7?

No. The day-of-week field runs 0 to 7: 0 and 7 are Sunday, 6 is Saturday. Weekdays are 1-5, which reads Monday through Friday. Some cron variants also accept names such as MON-FRI, but the numbers work everywhere.

How do I run at 9 AM on weekdays in a specific timezone?

Put the timezone on the host, or use CRON_TZ=Europe/Kyiv before the entry on daemons that support it, such as cronie. Plain Vixie cron ignores CRON_TZ. Then 0 9 * * 1-5 fires at 09:00 local time, and daylight saving shifts move it with the wall clock, which is what office hours want.